Resource Hub
Site Tip
Keep Every Service on One Plan
Power, NBN, water, gas and drainage should be coordinated before the first trench is cut.
Combine the service routes, pits, entries and future connections on one marked-up plan. This is easier to coordinate than five separate sketches that overlap on site.
Need Advice for Your Sydney Site?
Send the suburb, route photos, approximate length and the service being installed. We can assess underboring, trenching, access and excavation requirements.
Keep Reading
More Tips
Measure the Crossing Before You Call
A rough start-to-finish measurement makes an excavation conversation far more useful.
Photograph Both Ends of the Route
Two clear photos often reveal more than a long description.
Measure Narrow Gates and Side Access
The narrowest point determines whether plant can reach the excavation.
