Resource Hub
Site Tip
Check Clearances Before Boring
Entry and exit clearances affect alignment, safety and the final connection.
Check the bore line against retaining walls, footings, trees, existing services, drains and the finished surface. A few minutes of set-out can prevent a pit being moved after excavation starts.
Need Advice for Your Sydney Site?
Send the suburb, route photos, approximate length and the service being installed. We can assess underboring, trenching, access and excavation requirements.
Keep Reading
More Tips
Measure the Crossing Before You Call
A rough start-to-finish measurement makes an excavation conversation far more useful.
Photograph Both Ends of the Route
Two clear photos often reveal more than a long description.
Measure Narrow Gates and Side Access
The narrowest point determines whether plant can reach the excavation.
