Resource Hub
Site Tip
Cap Conduits Before Backfill
A small cap prevents dirt and water becoming a much bigger handover problem.
Protect every open conduit before backfill and after the excavation is complete. Label the service so the next trade can identify it without reopening the route.
Need Advice for Your Sydney Site?
Send the suburb, route photos, approximate length and the service being installed. We can assess underboring, trenching, access and excavation requirements.
Keep Reading
More Tips
Measure the Crossing Before You Call
A rough start-to-finish measurement makes an excavation conversation far more useful.
Photograph Both Ends of the Route
Two clear photos often reveal more than a long description.
Measure Narrow Gates and Side Access
The narrowest point determines whether plant can reach the excavation.
