Resource Hub
Site Tip
Book Inspections Before Backfill
A trench that is closed before inspection can become an expensive second excavation.
Confirm the electrician, plumber, builder, council or network-owner inspection points before the machine starts. Hold the trench open only as long as the approved process requires.
Need Advice for Your Sydney Site?
Send the suburb, route photos, approximate length and the service being installed. We can assess underboring, trenching, access and excavation requirements.
Keep Reading
More Tips
Measure the Crossing Before You Call
A rough start-to-finish measurement makes an excavation conversation far more useful.
Photograph Both Ends of the Route
Two clear photos often reveal more than a long description.
Measure Narrow Gates and Side Access
The narrowest point determines whether plant can reach the excavation.
