Resource Hub
Sydney Guide

UGOH and Underground Service Work for Level 2 ASPs

A field guide for Level 2 ASPs planning underground overhead-to-underground conversion and service connections in Sydney.

UGOH work can involve the underground path between a network connection point, boundary position and a customer's switchboard. The electrical design, network-owner requirements and site conditions determine the exact arrangement. The excavation crew's role is to deliver the trench, bore, pits and conduit path to the electrical brief.

Level 2 ASPs should provide the proposed route, conduit specification, depth and cover requirements, connection points, service drawings and any inspection hold points before excavation is booked. If the route crosses a driveway or public footpath, decide early whether trenchless underboring can reduce reinstatement.

A clean handover matters. Cap and label conduits, leave draw ropes as specified, photograph the completed path and communicate any ground or access variation before the electrical connection stage.

Site Checklist

  • Confirm the network-owner and ASP requirements
  • Provide conduit, depth and connection details
  • Identify UGOH entry, exit and switchboard points
  • Coordinate inspections and hold points
  • Photograph and label the completed underground path

Need Advice for Your Sydney Site?

Send the suburb, route photos, approximate length and the service being installed. We can assess underboring, trenching, access and excavation requirements.